Solano Community College Bond Program Website.
Program Description & 时间轴 项目 Information 通信 术语表 新闻稿 联系
Page Title, 项目 Information
Bldg 400, Student Services 瓦列霍中心 Architectural drawing of the new 维尔中心

MEASURE G BOND PROJECT STATUS

MEASURE G BOND PROJECT FUNDING SUMMARY AS OF JUNE 30, 2011

Solano Community College 瓦列霍中心 项目 新巴列霍中心是一个多层的设施,使mg摆脱网站能够大大扩展mg摆脱网站的课程和服务,以巴列霍的居民, Benicia and all of Solano County. The new facility includes classrooms, 演讲厅, computer laboratory, bookstore distribution space, youth theatre rehearsal space, art exhibit areas and outdoor spaces for study and relaxation. 该地区收购了位于哥伦布公园大道外Vallejo东北的10英亩土地.

mg电子官网瓦卡维尔中心项目,目前正在建设中
The committee has completed Master Planning for this center. 成本估算是基于在制定地区设施总体规划时商定的拟议项目和空间需求. The Site consists of 60 acres. While proposed budgets have been developed, 地区一级的优先事项正在发生变化,规划将需要考虑到这些变化. 项目概算还包括用于项目中确定的空间分配的第二类设备的费用.

Student Services Center 项目
这是一个新的两层楼的建筑,是在mg摆脱网站的费尔菲尔德校园,以巩固和改善学生获得学生服务计划. This building also has classrooms to expand and enhance student learning. 在这个位置, 该建筑建立了一个新的中央入口广场,为所有学生提供“一站式”服务场所.

Building 700 Humanities, Building 800 Health Services, 装修, and Building 900 New Faculty Office Building
All of these buildings are complete and occupied on the Fairfield campus.

ADA Phase I and II, Compliance in all Buildings
These 项目s will bring the District into compliance with Title 24, Executive Order 504, American with Disabilities Act. Phase I, provides for basic access routes to all buildings and programs. 第一期的规划和施工图已经完成并获得批准. 第二阶段包括所有剩余的工作,将完全符合美国残疾人法案. 第二阶段的建筑评价、初步计划和费用概算已经完成. 与特定建筑物直接相关的项目已被安排与建筑物的翻新和定期维护项目相吻合.

Repair Campus Utility Infrastructure
This area includes several major 项目s; such as replacement of five 15 Kv electrical substations, repair/replacement of hot and chill water distribution systems, and replacement of underground domestic water isolation values. 其余的项目在该地区的五年定期维修计划中确定. 第一个工程,包括冷热水分配已经完成.

运动复杂
该项目包括对该地区的体育设施进行重大翻新和扩建. 装修 include soccer and softball fields, and major renovations to the baseball and football complex. 这些项目的成本估算是由地区建筑师根据批准的计划完成的.

Building 装修 of Building 300, 500 and 1500 are complete.
这三栋建筑的改造被合并为一个阶段的施工合同, completed in the Summer and Fall of 2005.

Upgrade Exterior Lighting and install Building Security Systems
该项目包括外部照明系统的升级和建筑安全监控系统的安装. These projects have had some preliminary planning completed. The cost estimates are based on the information provided at that time.

Scheduled Maintenance Repairs
这是一系列定期维护维修项目,列在该地区的五年定期维护计划中,并在债券建设计划的六年预计期限内进行. 虽然已经确定了费用,但还没有拟订详细的计划. 与特定建筑直接相关的项目已被安排与该建筑的改造和ADA一期和二期项目同时进行.

       

主页 |  Program Description & 时间轴 |  项目 Information |  通信
术语表 |  新闻稿 |  联系 Information |  站点地图


mg电子官网- 4000 suissun Valley路,费尔菲尔德,CA 94534, 707-864-7196

Questions or comments on this site? E-mail: Web Administrator